Phase 2 Factory Area


Phase 2 Factory Area

Building area

27,033.03

Base area

95,007

Factory floor area

21,841.97

Painting factory area

7,700.3

Main Production and Manufacturing

Fabrication, Assembly, and Welding of Lower Leg Arch Head

X-brace fabrication, assembly and welding

Transition Phase Fabrication,   Assembly, and Welding

EP/IP Transition Phase Assembly and   Welding

The painting factory mainly produces

Component sandblasting

Component spray paint

2024世紀風電067.jpg