Phase 2 Factory Area
Phase 2 Factory Area | |
Building area | 27,033.03㎡ |
Base area | 95,007㎡ |
Factory floor area | 21,841.97㎡ |
Painting factory area | 7,700.3㎡ |
Main Production and Manufacturing | |
Fabrication, Assembly, and Welding of Lower Leg Arch Head | |
X-brace fabrication, assembly and welding | |
Transition Phase Fabrication, Assembly, and Welding | |
EP/IP Transition Phase Assembly and Welding | |
The painting factory mainly produces | |
Component sandblasting | |
Component spray paint |