Formosa 4 (Hai Sheng) Offshore Wind Farms


Developer               Synera Renewable Energy (SRE)


Capacity                  495MW

Site Location           18 to 20 km off the coast of Miaoli

Scope of Work         35 Jacket Type Foundations

Specifications          Height 91m, Weight 2,400 tons


Fabrication Period   2025-Ongoing