Phase 1 Factory Area
Phase 1 Factory Area | |
Building area | 38,009.29㎡ |
Base area | 57,702.00㎡ |
Factory floor area | 35,467.76㎡ |
Office building floor area | 8,417.97㎡ |
Main Production and Manufacturing | |
Fabrication, Assembly, and Welding of Upper Leg Arch Head | |
2D and 3D Assembly and Welding of Upper Structures | |
Lower Structure and Transition Phase Assembly and Welding | |
X-brace fabrication, assembly and welding |