Fuhai Offshore Met Mast


1738820229626046.jpg



The wind farm is located 8km

offshore from Fangyuan Township, Changhua.

Met Mast dimensions -

TowerHeight 72m / Weight 35t

Transition PieceHeight 18m / Weight 150t

Pin PileHeight 68m / Weight 340t 

OD/Thickness:4.2m / 50cm

Project duration2013-2015

Project division of work 

.Developed and designed by

 China Engineering Consultants, Inc. 

.Manufactured by

 Century Iron and Steel Industrial Co., Ltd.

.Installed by

 CSBC Corporation Taiwan.







Project Execution Status


福海1.jpg   1734576836552648.png